- Neo Biotech
- 3 days ago
- 1 min read
Updated: 3 days ago

Prof. Yongkwan Choi (Korea)
Pre-Op

Fixture Removal
Neobiotech FR(Fixture Removal) Kit


Removing prosthesis upper part
Connecting Fixture Remover Screw (FR Kit)
Removing the implants using Fixture Remover (FR Kit)
Removed existing implants
Implant Placement and Provisional Restoration
CMI IS-II active implants were placed buccally at #12 and #22 with intentional buccal exposure, considering occlusion and esthetics.
Extensive guided bone regeneration (GBR) was performed to restore the alveolar defect and ensure proper implant positioning. The procedure utilized allograft bone, xenograft, and an absorbable barrier membrane.
Suture
Making provisional screw retained restorations by using temporary abutments
Final Restoration
SCRP type of final restoration (labial view / lingual view)
Panoramic radiograph of the final delivery of the prosthesis

Follow-Up
6-year follow-up panoramic radiograph, showing no evident bone loss

Labial view (6-year after final restoration)
